Most teams run the same kind of project more than once. A client onboarding, a study startup, a yearly audit. And most of the time, someone opens an empty board and rebuilds the plan from memory. The step that caused trouble last time is usually the one that gets left out again.
In Planax, the fix is a plan template. You build the plan inside a real project, run the project, fix what didn't work, and then save that structure as a template. The next project starts from it instead of from a blank page.
One thing to know before you start: Planax doesn't come with a library of ready-made templates. Your templates are made from your own projects. A template written by someone else rarely matches how your team actually works, so this is the part you own.
Step 1: Build a plan worth keeping
Everything starts on a project's Plan screen. A plan is a tree of phases, with tasks and documents placed inside them. Tasks and documents need a plan to exist. If a project has none, its Tasks and Documents screens show a Plan Required notice with a Create Project Plan button.
Here's how the structure works:
- Phases nest up to three levels. That is enough for something like "Startup" containing "Site activation" containing one phase per site. Use Add Sub-phase from a phase's row menu to go one level down.
- Tasks and documents sit inside phases. From a phase's row menu, Add Task and Add Document create the item directly in that phase. Items added from the Add menu at the top land at the top level, and you can move them later.
- Order matters. Drag the handle on the left of a row to reorder items or move them into another phase. Move to Phase in the row menu does the same thing when the plan gets long.
Documents can also be organized into folders on the project's Documents screen. Keep that in mind, because folders come along when you save the template.
A practical tip while the project is running: when you notice a step that should have been in the plan from day one, add it right away. If you wait until the project ends, you'll forget half of them.
Step 2: Clean it up before you save it
When the project wraps, open the plan and read it top to bottom as if you were starting fresh.
- Remove tasks that only made sense for this one project.
- Rename anything tied to a specific client or person. "Kickoff with Acme" becomes "Client kickoff".
- Check that each phase holds what someone new would expect to find there.
Do this cleanup in the project itself. Once a template exists, the edit dialog only changes its name, description, and category. It shows the structure (phase, task, document, and folder counts) so you can check it, but you can't rearrange phases there.
Step 3: Save it with Import from Project
Go to workspace settings and open Templates. This is the Plan Templates page.
Open the import dialog
Click Import from Project.
Pick the source
Under Source Project, choose the project you just cleaned up.
Name it
Enter a Template Name and a short description of when to use it.
Import
Click Import Template.
Planax copies the plan structure of that project into the new template: phases, tasks, documents, and folders.
You'll also see a New Template button on the same page. That one creates an empty template with no phases or tasks. It's fine as a placeholder, but if you want a template you can actually start a project from, use Import from Project.
After importing, you can use the pencil button to set a category (Blank, Clinical Trial, General Research, or Custom). The category shows in the template list and helps once you have more than a handful.
Step 4: Start the next project from the template
Open Plan in a project that doesn't have a plan yet. Instead of an empty table, you get the Choose a Template screen.
Each template card shows how many phases, tasks, and documents it contains, plus an estimated duration if one is set. Click View Details to look through the structure before you commit. Pick the template and click Create Plan. The plan is created with the structure defined in the template.
If none of your templates fit, choose Empty Plan and build from scratch. If the result turns out well, it can become your next template.
Keeping templates useful over time
Templates go stale when nobody owns them. A few habits help:
Deactivate, don't delete. The power button in the template list switches a template between Active and Inactive. Inactive templates don't appear on the Choose a Template screen, but they're still there if you need them again. Deleting a template can't be undone.
Existing projects are safe. Deleting a template has no effect on projects that were already created from it. Their plans keep the structure they started with.
Replace instead of patching. Because the template's structure isn't edited directly, the cleanest update path is: run a project from the template, improve the plan as you go, import that project as a new template, then deactivate the old one. Putting a date or version in the template name ("Client onboarding 2026-10") makes it obvious which one is current.
Write the description for the next person. "Use for new enterprise clients with a security review" tells a teammate more than "Onboarding v2".
Where to start
You don't need to design a perfect template up front. Take the last project that went well, spend ten minutes removing the one-off parts, and import it. The next project of that kind will start from a plan your team already tested.