Plan
The Plan screen is where you break a project into phases and place tasks and documents in each phase to set up the overall structure. Click Plan under a project in the sidebar to open it.
A plan must exist before you can use tasks and documents. On the Tasks and Documents screens of a project without a plan, you see a Plan Required message and a Create Project Plan button.
Create a plan
When you open Plan in a project without a plan, the Choose a Template screen appears.
Choose how to start
Pick one of the templates registered in your workspace, or pick Empty Plan to build from scratch. Each template card shows the number of phases, tasks, and documents and the estimated duration. Click View Details to preview the template structure.
Create the plan
Click Create Plan. If you picked a template, the plan is created with the structure defined in that template.
Manage templates from the Templates menu in the workspace settings. To turn an existing project's plan into a template, use Import from Project. For details, see Workspace settings.
View the plan table
Once a plan is created, phases, tasks, and documents appear in a single table.
| Column | Description |
|---|---|
| Name | The item name. Items inside a phase are indented |
| Type | Phase, Task, Document |
| Children | The number of items in a phase |
| Status | The item's current status |
| Dates | Start date and end date |
- Click the arrow to the left of a phase name to expand the items inside it.
- Use Expand All / Collapse All to expand or collapse all phases at once.
- Use the refresh button (Refresh) at the top right to reload the latest state.
Status labels
| Type | Statuses |
|---|---|
| Phase | Pending, In Progress, Completed, Blocked |
| Task | To Do, In Progress, Blocked, Done, Closed |
| Document | Draft, Review, Approved, Archived, Rejected |
The Plan screen is view-only for statuses. Change task and document statuses on the Tasks and Documents screens.
Add items
From the Add menu at the top right, choose Phase, Task, or Document. Tasks and documents added here are created at the top level of the plan. To put them inside a specific phase, use the row menu below.
Create a phase
In the Create New Phase dialog, enter the following and click Create Phase.
| Field | Description |
|---|---|
| Name | The phase name (required) |
| Parent Phase | Select one to place the phase inside another phase. Choose None (top level) to make it a top-level phase |
| Start Date, End Date | The phase's dates (optional). The end date can't be earlier than the start date |
Phases can be nested up to 3 levels.
Add tasks and documents
In the Add Task or Add Document dialog, enter a Title (required) and Description (optional), then click Add Task or Add Document. If you opened the dialog from a phase, the item is created inside that phase.
Row menu
Click the three-dot button (Actions) at the far right of each row to open the menu.
| Menu | Applies to | Description |
|---|---|---|
| Add Sub-phase | Phase | Opens the Create New Sub-phase dialog with this phase set as the parent |
| Add Task | Phase | Creates a task inside this phase |
| Add Document | Phase | Creates a document inside this phase |
| Move to Phase | All items | Moves the item to another phase or to the Root (top level) |
In the Move to Phase dialog, choose the destination and click Move. You can't move an item into itself or into one of its own sub-phases.
Edit directly in the table
- Reorder and move: Drag the handle on the left of a row (Drag to move) to reorder items or move them to another phase. When you drag an item inside a phase, a Drop here to move to root level area appears at the bottom of the table. Drop it there to move the item to the top level.
- Edit dates: Click a date in the Dates column (Start and End if empty) and pick a date from the calendar.
- Rename a phase: Double-click a phase name to edit it in place. Press Enter to save and Esc to cancel.
Detail panel
Click a row to open the detail panel on the right. The panel shows Type, Status, Start Date, and End Date, plus Assignee for tasks that have one.
- Click Start Date or End Date to change the dates.
- For a phase, click the name at the top of the panel to rename it, and use the Add Task and Add Document buttons to create items inside the phase.
Phases, tasks, and documents with dates also appear in the Calendar.