Tasks
On a project's Tasks tab, you create to-dos, set assignees and schedules, and manage progress.
The Tasks tab is available only when the project has a plan. If there is no plan, a Plan Required message appears. Create a plan first with the Create Project Plan button. For details, see Plan.
Task list screen
You can do the following from the toolbar at the top of the screen.
| Item | Description |
|---|---|
| Search tasks... | Find tasks by keyword. |
| Status | Filter the list by one of To Do, In Progress, Blocked, or Done. |
| Priority | Filter the list by one of High, Medium, or Low. |
| Assignee | See only the tasks assigned to a specific member. |
| All / Due / Bypass | Filter the list by issue. See the issue filter description below. |
| Clear Filter | Clears the search and all filters. It appears only when a filter or search is active, and the sort stays as it is. |
| Sort | Choose one of Due Date, Created, or Priority, then choose Ascending or Descending. The default is due date ascending. |
| View switch | Choose one of List View, Status View, Board View, or Group by Assignee. |
| Refresh | Reloads the list. |
| New Task | Creates a new task right away. |
When the screen is narrow, the Status, Priority, and Assignee filters collapse into a single Filters button. Filter and view settings are saved in the address (URL), so if you share the address, others see the same list with the same conditions.
Issue filter
| Option | Tasks shown |
|---|---|
| All | All tasks |
| Due | Tasks that are due within 3 days from today or already overdue, and are not yet completed |
| Bypass | Tasks that are in progress or completed even though their predecessors are not finished |
When you choose a filter, an info icon appears next to it. Hover over it to see how the filter is determined. For more about predecessors, see Dependencies and issue lists.
Views
| View | Description |
|---|---|
| List View | Lists tasks one per row. If a task has subtasks, you can expand them with the arrow. |
| Status View | Groups tasks by status and lists them vertically. When the screen is wide enough, a dependency state such as Waiting on, Bypass, or Ready to start appears next to each task. |
| Board View | Shows a kanban board split into a column for each status. |
| Group by Assignee | Groups tasks by assignee. Tasks with no assignee are collected at the end in the Unassigned group. |
When the screen is wide enough, the list also shows the name of the predecessor that is blocking a task.
Create a task
Click New Task
Click the New Task button in the toolbar. You can also right-click an empty area of the list and choose Create Task.
Set the title
A task titled "Untitled" is created right away, and the detail panel opens on the right. Click the pencil icon (Edit task) at the top of the detail panel, enter a title, and click Save. You can also click the title at the top of the panel to edit it directly.
Enter the details
Set the status, priority, phase, assignee, and dates in the detail panel.
A new task is created with the To Do status and Medium priority. A title can be up to 255 characters.
Edit directly in the list
In List View, you can change values right from each row without opening the detail panel.
- Priority: Click the dot at the start of the row and choose from None, High, Medium, or Low.
- Status: Click the status button and choose from To Do, In Progress, Blocked, Done, or Closed.
- Assignee: Click the assignee button, search for a project member, and assign them. Choose No assignee to remove the assignment.
- Due date: Click the due date (No date if none) and pick one from the calendar. Incomplete tasks that are past their due date are shown in red.
Tasks that are done or closed have a strikethrough on the title.
Show earlier completed items
Old completed tasks are hidden from the list automatically. Click Show earlier items to load the hidden items, and use Load more to keep going. In List View, this button is at the bottom of the list. In Status View and Board View, it is inside the Done and Closed groups. It does not appear while you are searching.
Task detail panel
Click a task in the list to open the detail panel on the right. The address then gets ?taskId=... added, so you can copy the address to show a specific task directly to another member. Drag the edge of the panel to adjust its width.
Top buttons
| Button | Description |
|---|---|
| Pencil icon (Edit task) | Change the title or delete the task. |
| Refresh | Reloads the task information. |
| Speech bubble icon (Hide comments / Show comments) | Hides or shows the comments area on the left of the panel. |
| Eye icon (Watch) | Get notified about changes to this task. Hover to see the list of members who are watching. |
For writing comments, attaching files, mentions (@), and watch notifications, see Comments, mentions, and notifications.
Dates
The Start, Due, and Completed dates are shown side by side at the top of the panel. Click Set under each date to pick a date. When you change the status to Done or Closed, the completed date is filled in with today automatically, and when you change it back to another status, the completed date is cleared.
Detail
| Item | Description |
|---|---|
| Status | To Do, In Progress, Blocked, Done, Closed |
| Priority | None, High, Medium, Low |
| Phase | Choose the phase of the plan this task belongs to. |
| Assignee | Assign one of the project members. |
Subtasks
Click the Add button in the Subtasks section to create an "Untitled" subtask. Click the subtask to go to its own detail panel, where you can change the title and content.
Subtasks can go only one level deep. The detail panel of a subtask does not show a Subtasks section.
Description
Click the Edit button in the Description section or View all → to open the editor. Markdown is supported.
Checklist
Type an item in the input box of the Checklist section and press Shift + Enter to add it. You can edit or delete the items you add. Depending on your plan, the checklist area may be locked.
Links
In the Links section, link other tasks or documents. Linking with the blocks type creates a predecessor relationship. For how to link and the link types, see Dependencies and issue lists.
Basic Info and Activity
- Basic Info: Check the created date, modified date, and ID, and enter Tags.
- Activity: See the history of changes made to this task in chronological order.
Both sections are collapsed at first, so click the heading to expand them.
Delete a task
Open Edit task
Click the pencil icon (Edit task) at the top of the detail panel.
Click Delete
Click the Delete button in the dialog.
Confirm deletion
In the Delete Task confirmation dialog, click Delete.
A deleted task cannot be restored.