Every project has an order. Requirements before design. Protocol sign-off before the first site visit. The order usually lives in someone's head, and that works until the day a designer starts on mockups while the requirements are still changing. Nobody notices until the rework shows up.
Planax lets you write that order down as links between tasks and documents. Once it's written down, Planax checks every item against it and tells you which work can start, which is stuck, and which went ahead anyway.
Mark what has to finish first
The relationship is a link of type blocks. You add it from the item that has to finish first.
Say "Write requirements" has to be done before "Draft design mockups" can start.
Open the first item
Open the detail panel of "Write requirements".
Add a link
In the Links section, click Add.
Choose blocks
Click Select link type... and choose blocks.
Find the next item
Type "Draft design mockups" into Search tasks or documents... and click the result. The link is created right away.
Open "Draft design mockups" and you'll see the same relationship from the other side, shown as IS BLOCKED BY.
Links always start from the item you have open. If A has to finish before B, open A and link B with blocks. Doing it from B's side would point the relationship the wrong way.
Links work between tasks and documents in any combination. A document can block a task: "Final requirements spec" blocks "Draft design mockups" if you want the signed-off document, not the task, to be the gate.
There are other link types too: relates to, references, clones, duplicates, and supersedes. They record a relationship, but only blocks affects the checks described below.
What Planax does with the link
Every item that sits behind a blocks link gets one of three states, based on where its prerequisites are:
| State | When |
|---|---|
| Ready to start | It has no prerequisites, or all of them are done. |
| Waiting on | At least one prerequisite isn't done, and this item hasn't started either. |
| Bypass | At least one prerequisite isn't done, but this item is already in progress or done. |
Walk through the example:
- Both tasks are To Do. "Draft design mockups" is Waiting on. That's normal.
- The designer gets impatient and moves "Draft design mockups" to In Progress while "Write requirements" is still open. It becomes Bypass.
- "Write requirements" is marked Done. "Draft design mockups" becomes Ready to start, because nothing in front of it is unfinished anymore.
Waiting on is just information. Bypass is the one that deserves a look, because it means the order you wrote down wasn't followed.
Seeing it in the task list
You don't have to open each item to check its state.
- In the Tasks tab, Status View shows the state next to each task when the screen is wide enough, along with the type and name of the unfinished prerequisite.
- List View shows the name of the unfinished prerequisite next to the task title, and Board View cards show the same.
Both the task list and the document list have an issue filter with All, Due, and Bypass:
- Due shows items that aren't done and are due within three days or already overdue.
- Bypass shows items that are in progress or done while a prerequisite is still unfinished.
Pick a filter and hover the info icon next to it to see exactly how it's decided. Filters and view settings are saved in the URL, so you can send a teammate a link to "all bypassed tasks in this project" and they'll see the same list.
Seeing it on the project overview
The project Overview is where this pays off in a weekly check-in.
The progress bar at the top shows two counts next to the progress number:
- Waiting on: work that's due soon but still has an unfinished prerequisite. Clicking it opens the task list in Status View with the Due filter applied.
- Bypass Issue: work that's in progress ahead of its prerequisites. Clicking it opens the task list with the Bypass filter applied.
Below that, two widgets do most of the work:
Wait / Ready Issue List collects unfinished work that's due within three days or already overdue, and splits it into tabs: All, Waiting on, and Ready to start. Each row shows the item, its prerequisite, and its due date and status. The Ready to start tab is a good answer to "what can people pick up today?" The Waiting on tab tells you which prerequisites to chase.
Bypass Issue List shows tasks and documents that are already in progress while a prerequisite isn't finished, together with the prerequisite they skipped. If your process has steps that really must happen in order, this is the list to check.
Note that the wait and ready lists only cover work that's due soon or overdue. Something due next month that's waiting on a prerequisite won't show up there yet. Use the task list for the full picture.
What to do when something shows up
When an item sits in Waiting on for a while, the problem is usually upstream. Check who owns the prerequisite and when it's due before you push on the waiting item.
When something shows up as Bypass, ask whether skipping the order was a deliberate call. Sometimes it is: the designer started on layout because the open requirement only affects copy. Sometimes it isn't, and the right move is to finish the prerequisite first or pause the work that jumped ahead. Either way, you find out now instead of at review time.
One more habit: add blocks links when you set up the plan, not after something goes wrong. The checks can only catch an order you've written down.